Serving Union City & Southern Alameda CountyCall (510) 998-2728
Asphalt Paving in Berkeley, CA

The fault runs under the stadium

Asphalt Paving in Berkeley, CA

Pavement in a city where you can see fault creep in the streets.

  • Free on-site estimates
  • Itemized written quote before work starts
  • Right-of-way and permit needs checked at the estimate

Paving Along the Fault in Berkeley

Asphalt paving in Berkeley comes with a visible reminder of what the ground is doing. The Hayward Fault crosses the city, and its creep shows in cracked roadways, sharp jogs in streams and springs. A segment runs lengthwise down the middle of California Memorial Stadium, where creep has offset the original walls by about 13 inches since 1923. Pavement near the fault cracks in rows that reopen.

Flats and hills

Most of Berkeley sits on a rolling plain rising from the bay to the base of the Berkeley Hills, which reach 1,754 feet at Grizzly Peak. Flat neighborhoods need drainage; hill driveways need grade control. Berkeley's rainfall, about 25 to 26 inches a year with February the wettest month, is heavier than the southern Alameda County cities, so runoff planning matters.

Older housing

Berkeley's neighborhoods are old, with 165 buildings designated as landmarks or structures of merit. Driveways behind older homes are often narrow and shared, and replacing them means hand work and careful staging.

Renters and small lots

About 59 percent of Berkeley's homes are rented. Small apartment lots and shared driveways need patching, crack sealing and occasional resurfacing, scheduled so residents keep access.

City approval at the street

Berkeley requires city permission for work in the public right-of-way; we confirm the current requirements before any apron or sidewalk work is scheduled.

Narrow driveways and tight access

Older Berkeley lots often have a single-car driveway running between houses to a garage at the back. Asphalt work in that space means small rollers, hand placement and protecting the siding and fences on both sides. We plan the order of work so the neighbor keeps access where the driveway is shared.

Drainage in a wetter city

With February averaging over 5 inches of rain, Berkeley pavement has to move water fast. We set grades toward the street or a drain, and on hill properties add swales to catch runoff before it reaches the driveway.

Maintenance near the fault

Properties near the fault trace benefit from crack sealing every year or two, and a sealcoat once the surface fades.

Cost factors

Narrow access, hand work and hill grades add cost; HomeGuide puts slopes and curves at 15 to 30 percent extra. Your written estimate lists each part of the job.

Next step

Call (510) 998-2728 or

Get a Free Estimate

.

Berkeley at a Glance

  • Visible fault creep. The Hayward Fault crosses Berkeley; at California Memorial Stadium, creep has offset the original walls by about 13 inches since 1923.
  • Hills. Most of Berkeley sits on a sedimentary plain rising to the Berkeley Hills, which reach 1,754 feet at Grizzly Peak.
  • Rainfall. Berkeley averages roughly 25 to 26 inches of precipitation a year, with February the wettest month at about 5.21 inches.
  • Rental majority. In 2010, 59.1 percent of Berkeley's occupied housing units were renter-occupied.
Asphalt Repair in Union City, CA

Berkeley Questions

Can fault cracks in my Berkeley driveway be fixed?

They can be sealed to keep water out, but creep will reopen them. Plan on regular sealing.

Do you work on shared driveways?

Yes, coordinating with both owners on scope and cost.

Do you pave hill driveways in Berkeley?

Yes, with lift compaction, edge support and drainage planning.

How long does a narrow driveway take to pave?

Usually a day or two of work after any removal, depending on access and how much hand work is needed.

Free Estimates in Berkeley, CA

Free asphalt estimates in Berkeley.

Call Now: (510) 998-2728